Image shows setting up of sacrificial formwork for slabs

Two outlets are visible to which tensiion machine will be hooked up and pull on the reo bars exposed.


Close up of previous image.


Photo shows a coloumn with starter bars tat will connect to the next floor when it is poured.

Starter Bars atop a poured coloumn with formwork know flush with top of coloumn ready for connection of reinforcemnt for slab and puring of cement



Tilt up pre-cast panel being propped until ready to be connected to other panels/floor